Supply and install of ground screws for three bespoke pods, with extended decking created for Team Jak Foundation as practical, social and emotional support units for young people with cancer related illnesses and their families.
Client: | Urban Pods |
Location: | Livingston |
Product: | 36 Nr. RDX PRO RF200 76x1250mm Ground Screws for Pods 9 Nr. RDX PRO RF200 76×1050 Ground Screws for Decking |
Project Cost: | Available on request |
Challenge
Solid foundations were needed quickly due to constraints with project programme. From initial survey to completed installation we were faced with 10 days before Urban Pods were erecting units. A sloping site with varying ground conditions required a versatile solution for foundations.
Solution
Site survey, ground screw foundation design and layout created in conjunction with the client to suit the bespoke built pods. 45 Nr. ground screws installed within two days, each unit of 15 screws installed level and stepped progressively as the site levels changed, ready to build on without delay.
This was our first project with No More Digging and they didn’t disappoint. We were on a tight deadline to install our pods to allow other trades to progress. Installation was completed and we were erecting the following day. We’ve never looked back since, using No More Digging and their ground screws for our projects all over Scotland.
– Ross Iwaniec, Urban Pods